Building 4500 Phase 2

A Grade A, LEED Gold-certified research facility under construction, completion scheduled for Q4 2026.

BUILDING OVERVIEW

Advanced R&D Infrastructure, Ready When You Are

LEED Gold-certified with individual laboratory spaces of approximately 13,000 Sq. Ft. and 30% pre-leasing already secured. Completion is expected by Q4 2026.

40,000 Sq. Ft

lab space per floor horizontally connected laboratory configurations supporting large-scale, collaborative research environments.

13,000 Sq. Ft.

Dedicated Lab Wing
High-specification laboratory environments engineered for advanced pharma and biotech research operations.

Full-service R&D

Full-service R&D utilities water, chillers, nitrogen, vacuum, air compressor, BMS, and gas piping connected to individual laboratory suites.
GALLERY

Inside Building 4500 Phase 2

TECHNICAL SPECIFICATIONS

Building Specifications

Building Type

R&D / Laboratory Facility

Floor Height

4.5 Meters

Parking

Independent Dedicated Parking

Location

Genome Valley

Status

Under Construction

Tenancy

Multi-Tenant

SYSTEMS & FACILITIES

GMP-compliant laboratory infrastructure with full utility provision, fire systems, biophilic design, and power backup.

40,000 Sq. Ft.
Independent Lab Suites
Full Utilities
100% Power Backup
Gas Piping
Biophilic Design
Fire Suppression
40,000 Sq. Ft.
Independent Lab Suites
Full Utilities
100% Power Backup
Gas Piping
Biophilic Design
Fire Suppression

Explore other Buildings

View All
View all

Establish Your Presence in a Leading Life Sciences Cluster

Connect with our team to schedule a site visit, discuss your space requirements, or learn more about available laboratory buildings across our portfolios in Genome Valley.
Contact Us